To the Planning Board and the Land Use Committee of the Board of
Aldermen, regarding the proposed PUD-B1 Zoning Amendment:
Although I support higher-density development on the MaxPak property,
I urge the Planning Board not to recommend the proposed zoning, and
the Board of Aldermen not to enact it, until the following changes
are made to the attached Development Covenant:
1) Section 3A of the Covenant allows the Developer to use the
undeveloped portion of the Community Path (the abandoned railroad
right-of-way) as a construction access road for the first two years
of the project, requiring the Developer only to "leave the Community
Path in the same or better condition as the Path is in as of the date
of this Covenant". I
I do not object to the Developer using the right-of-way in this
manner, but the Covenant does not provide sufficient safeguards to
ensure that this does not impede or delay the Path extension. The
Developer should be required to REMOVE all of the railroad tracks and
ties now on the right-of-way BEFORE building any temporary
construction road. This way, the Path extension can benefit from the
Developer's actions. Allowing the Developer to build a construction
road ON TOP OF the existing tracks can only put another roadblock in
the way of Path extension, as it is one more thing that will have to
be removed eventually.
The covenant should also include a penalty, to be paid by the
Developer to the City, if the Developer does not cease using the
right-of-way within the agreed time limit. The City can use this
penalty money can be used for Path construction.
2) Section 6 of the Covenant allows the Developer to enact
unspecified future regulations on bicycles and dogs within the
development. This language should be changed to require that the
Developer provide an unimpeded route through the development at all
times, usable by bicyclists without their needing to dismount or walk
their bicycles, to move between the Community Path and Lowell
Street. This condition also needs to be binding on all future
owners (e.g. the condominium association that will remain once the
Developer has divested its interest in the property).
3) Section 6 also requires the Developer to provide only one access
point from the Community Path, and a second one "if feasible". This
should be changed to require the Developer to provide four access
points, as agreed to in community meetings and as shown on the
Developer's proposed map.
4) The Developer, the City, and neighbors should hold a meeting in
the local neighborhood to fully discuss the Covenant before this
Zoning Amendment is approved.
In addition, the Developer's proposal shows only residential
development on this site. The zoning should allow for small shops
or cafes along the Community Path edge of the development, which
would be useful to residents of the development, residents of
surrounding neighborhoods, visitors to the proposed public park, and
users of the Community Path.
Sincerely,
Ron Newman
18 Day Street #310
Somerville, MA 02144
Member, Somerville Bicycle Committee