[SBC] MaxPac - proposed covenant and zoning amendment
Ron Newman
rnewman at thecia.net
Tue Jan 30 09:52:07 EST 2007
The attached PDF contains the proposed zoning amendment and covenant
agreement between the city and the MaxPac developer.
This section is of particular concern to us:
3. In the application for Special Permit with Site Plan Review for
each construction
phase described in this section, the Developer shall include a
construction mitigation plan
acceptable to the Planning Board (in coordination with the
Inspectional Services
Department and Department of Traffic and Parking) with the goal of
minimizing
inconvenience to the surrounding neighborhoods. Construction of the
Project shall be
phased as follows:
a. Phase 1 shall consist of the construction of up to 65
residential units (with
no more than 110 bedrooms) at the Warwick/Clyde Street edge of the
Property.
Phase 1 is estimated to take 18-24 months. The Developer has applied
for and
obtained preliminary approval from the Massachusetts Bay Transportation
Authority (through Transit Realty Associates) to use the undeveloped
portion of
the Community Path between Lowell and Cedar Streets for access and
egress of
construction vehicles during Phase 1 (with the proviso that such use
shall not
interfere with or delay the City of Somerville’s construction of the
permanent
Community Path between Lowell and Cedar Streets anticipated to
commence in
the Spring of 2009). At a minimum, the Developer shall leave the
Community
Path in the same or better condition as the Path is in as of the date
of this
Covenant.
-------------- next part --------------
A non-text attachment was scrubbed...
Name: Maxpac.pdf
Type: application/pdf
Size: 272382 bytes
Desc: not available
Url : http://lists.bostoncoop.net/pipermail/sbc/attachments/20070130/60e517f3/Maxpac-0001.pdf